Mechanical Commissioning LeadActive$177K–$285K

The opportunity

The Mechanical Commissioning Lead owns mechanical commissioning planning, readiness, quality coordination, and test execution oversight for the project. This role ensures mechanical systems are installed, inspected, started, balanced, controlled, and tested in a way that…

What you'll do

  • Develop and maintain the mechanical commissioning scope, readiness criteria,: inspection strategy, and discipline test execution plan.

  • Review mechanical design packages, specifications, submittals, method: statements, controls narratives, sequence assumptions, and testing requirements for commissionability and risk.

  • Coordinate mechanical QA/QC inspections with contractors and vendor: field/test engineers, including installation checks, pre-functional readiness, deficiency capture, and closeout tracking.

  • Own mechanical commissioning procedure development and review, including: equipment startup, functional testing, controls verification, balancing prerequisites, failure mode validation, and integrated systems testing inputs.

  • Coordinate with equipment vendors on factory/site acceptance requirements,: startup support, test prerequisites, documentation packages, and vendor participation during critical tests.

  • Support readiness and execution for cooling, ventilation, hydronic, pumping,: heat rejection, controls, and other project-specific mechanical systems.

What they're looking for

  • Lead discipline-level review of mechanical test results, deficiencies,: corrective actions, retest requirements, trend logs, and acceptance evidence.
  • Maintain mechanical commissioning dashboards and status inputs for the: Commissioning Project Lead, including risk items, resource needs, test readiness, and issue aging.
  • Partner with the Electrical Commissioning Lead on cross-discipline: dependencies, including power availability, controls integration, emergency modes, heat load scenarios, and integrated testing sequences.
  • Support turnover by confirming mechanical documentation, as-built evidence,: test records, trend data, and outstanding issue disposition are complete and usable by operations.