Staff Architect, EPCActive$42K–$104K

The opportunity

Redwood Materials was founded in 2017 by JB Straubel, co-founder and former CTO of Tesla, on a simple but radical idea: the critical minerals powering the energy transition already exist. They just need to come back.

What you'll do

  • Lead code analysis and life safety design and documentation, including: occupancy classification, control areas and maximum allowable quantities for hazardous materials, egress, and fire-resistance-rated construction, through permit approval

  • Serve as a primary architectural liaison to Authorities Having Jurisdiction: (AHJs); develop and document permit exemption lists, lead Alternate Materials and Methods (AMM) requests and variances, and shepherd permitting processes with local officials

  • Develop architectural concepts and designs across various project types,: producing detailed drawings, plans, and models using Revit and related BIM tools throughout all project phases — from concept through construction administration

  • Collaborate with design teams, leadership, consultants, contractors, vendors,: and project stakeholders to ensure the successful integration of project objectives, particularly in scope and space optimization

  • Lead design coordination by working closely with design managers on project: package structures, conducting field walks, and gathering stakeholder input

  • Scope, select, and manage external architectural consultants, including: proposal review, deliverable quality, and schedule performance

What they're looking for

  • Lead planning efforts by developing and updating concept plans,: conceptualizing future needs, gathering feedback from key stakeholders, and ensuring alignment with company objectives
  • Develop process improvements, workflows, and templates to increase design productivity
  • Serve as Architect of Record on designated projects, stamping construction: documents in Nevada and as required, in other project states
  • Provide construction observation and contract administration: RFI and submittal review, site observation reports, punch list, and closeout