Principal Power & Energy Infrastructure LeadActive$52K–$83K
The opportunity
Anduril Industries is a defense technology company with a mission to transform U. S.
What you'll do
Pre-construction & Design Own the power narrative for every new site and: expansion — from site selection diligence through design development, permit set, and commissioning.
Right-size user demand. Build load models grounded in actual equipment lists,: duty cycles, and diversity factors rather than nameplate sums, and defend those numbers to designers, utilities, and finance.
Set the grid interconnection strategy: service voltage and configuration, primary vs. secondary metering, transformer and switchgear sizing, and the staging plan that lets us occupy early and scale later.
Define backup and resiliency architecture: generators, UPS, battery storage, paralleling and transfer schemes, N+1 decisions — tied to which loads actually have to ride through an outage.
Evaluate on-site generation and microgrid options where they shorten: schedule, lower cost, or de-risk utility dependence.
Review electrical design packages from AE partners; catch the sizing,: selective coordination, and maintainability problems while they are still drawings.
What they're looking for
- Build the cost and schedule inputs for power scope in capital plans, and flag: power-driven schedule risk early enough to act on it.
- Facilities Operations & Operational Excellence Partner with Facilities to: translate each new system into a preventive maintenance program — PM tasks, intervals, spares, and vendor service agreements — loaded into the CMMS before turnover, not after the first failure.
- Own the reliability standard for electrical infrastructure across sites: infrared scanning, breaker and relay testing, generator and ATS exercise regimes, battery and UPS maintenance, arc flash studies, and label currency.
- Establish power monitoring and metering standards so that load growth, power: quality, and capacity headroom are visible per site rather than discovered during the next outage.