Data Center Construction Site Foreman (Querétaro, Mexico)Active$132K–$176K

The opportunity

Lambda, The Superintelligence Cloud, is a leader in AI cloud infrastructure serving tens of thousands of customers. Our customers range from AI researchers to enterprises and hyperscalers.

What you'll do

  • Daily Field Supervision: Serve as Lambda’s on-site lead for assigned data center projects. Direct daily activity across MEP contractors, low voltage and network installers, rack and integration crews, and OEM field service teams. Run daily huddles, set the day’s priorities, and confirm each crew knows its scope, sequence, and constraints.

  • Fit-Out & Installation Oversight: Oversee physical execution of white space fit-out work including rack and cabinet setting, containment, busway and branch circuit distribution, rPDU installation, cable tray, structured cabling, liquid cooling and CDU tie-ins, and airflow management. Verify installations match approved drawings and Lambda standards before work is covered or energized.

  • Safety Leadership: Enforce site safety requirements, energized work permits, LOTO procedures, hot work permits, and PPE compliance. Conduct daily safety walks, stop unsafe work immediately, and lead incident and near-miss reporting with the data center provider and general contractor.

  • Quality Control & Inspections: Perform in-progress and pre-cover inspections, torque and terminations checks, labeling verification, and workmanship reviews. Build and drive punch lists to closure, rejecting non-conforming work and confirming corrections in the field.

  • Trade & Vendor Coordination: Deconflict overlapping trade work, sequence access to shared space and shafts, and coordinate outage and switching windows with the data center provider. Escort and manage vendor access, badging, tool and material handling, and site rules compliance.

  • OFCI Material Management: Receive, inspect, stage, and secure OFCI (Owner-Furnished, Contractor-Installed) equipment. Verify shipments against packing lists and submittals, document damage and shortages immediately, manage laydown and storage areas, and confirm material readiness ahead of each install window.

What they're looking for

  • Schedule Support & Lookaheads: Own the three-week lookahead in the field. Track daily progress against the construction schedule, flag manpower and material gaps early, and provide the Implementation Project Manager with accurate percent-complete and constraint data.
  • Field Documentation & Reporting: Produce daily field reports covering manpower counts, work completed, deliveries, delays, safety observations, and photo documentation. Maintain redline markups, RFI and field observation logs, and as-built notes for turnover.
  • Issue Resolution & Escalation: Resolve constructability conflicts and field questions at the site level where possible. Generate clear RFIs with photos and drawing references when a design or scope decision is needed, and escalate cost, schedule, or safety impacts without delay.
  • Commissioning & Turnover Support: Support pre-functional checks, Level 1 through Level 4 commissioning activities, and integrated systems testing. Coordinate contractor availability for scripts, witness testing where directed, and drive open-item closure through final acceptance and handoff to Data Center Operations.